More junk
March 19th, 2008
Getting close to having everything I need to get started on the motor swap. My y8 transmission is in the shop getting the LSD installed and my turbine, downpipe, and manifold are getting ceramic coating. I got my Hondata s300, and some more things have arrived in the mail as well, including Skunk2 sport shocks, Skunk2 front camber kit, IC piping, and some Greddy electronics (TT and Profec-B). Should have another shipment of things arriving in the next day or two also. Oh, also got my powder coated valve cover back, check out the link for the vc to see all the refreshed/cleaned up parts.